|
1.
Prepare the tractor.
a.
Refer to Preparing the Tractor section.
b.
Install mounting frames.
c.
Install hood guard.
2.
Prepare the loader.
a.
Remove shipping banding, wire and dunnage.
|
b.
Install bucket/attachment.
c.
Install hydraulic hoses.
d.
Position loader to mount on tractor.
3.
Attach loader to tractor.
4.
Perform final inspection and adjustments.
5.
Install optional equipment/attachments.
|