|
1.
Prepare the tractor.
a.
See Preparing the Tractor section.
b.
Install mounting frames.
c.
Install hood guard.
2.
Prepare the loader.
a.
Remove shipping banding, wire and dunnage.
b.
Install bucket/attachment.
|
c.
Install hydraulic hoses.
d.
Position loader to mount on tractor.
3.
Attach loader to tractor.
a.
Check and adjust latch bar alignment.
b.
Tighten mounting frame hardware.
4.
Perform final inspection and adjustments.
5.
Install optional equipment/attachments.
|