1.
Prepare the tractor.
a.
Refer to Preparing the Tractor section.
b.
Install hood guard.
c.
Install mounting frames.
2.
Prepare the loader.
a.
Remove all crates, parts and bucket/attachment from around loader assembly.
b.
Attach lifting straps to loader assembly and overhead hoist. Lower loader assembly to ground (horizontal).
c.
Remove and discard shipping banding, wire and wood pallet.
d.
Cut paint mask rings off all cylinders.
|
e.
522 Loader:
Check lift cylinder position.
f.
5105 and 5205 Tractors:
Install lift cylinder stops.
g.
Install locking pins.
h.
Install timing rod.
3.
Install hydraulic control valve/hoses.
4.
Install loader on tractor.
5.
Install bucket/attachment.
6.
Perform final inspection and adjustments.
7.
Install optional equipment/attachments.
|