Removing Material from a Pile

1. Approach and enter pile with bucket level. If the pile is high, remove the top first.

NOTE: Bucket top is parallel to bottom. Bucket is level when top is level. Bucket level indicator attachment is standard equipment.

2. Use a combined motion of moving forward slowly, lifting and rolling back to fill the bucket.

NOTE: Overfilling the bucket in heavy or packed material may cause the loader to stall. If loader stalls, back up or take less material.

W01783

OUO6077,00018CE -19-17NOV04-1/1