Backfilling

1. When backfilling from a large pile, shovel off the top of the pile, pushing toward the excavation. Drag some soil back to form a work ramp of convenient grade.

2. Approach the pile with a level bucket. Actuate the lift and bucket controls to determine the amount of material to be pushed.

W01147

OUO6038,0001596 -19-19MAR02-1/1