First 10 Hours

  • Lubricate fittings on each side of loader. (See procedure in EVERY 10 HOURS in this section.)
  • Tighten mounting frame hardware on both sides. (See procedure in EVERY 50 HOURS in this section.)
  • Tighten nuts on pivot pins and front frame on both sides of loader. (See procedure in EVERY 50 HOURS in this section.)
  • Check parking latch cap screw adjustment. (See procedure in EVERY 50 HOURS in this section.)

OUMX005,00017CF -19-09MAR04-1/1