First 10 Hours

  • Lubricate fittings on each side of loader. (See procedure in EVERY 10 HOURS in this section.)
  • Tighten mounting frame hardware on both sides. (See procedure in EVERY 50 HOURS in this section.)
  • Tighten nuts on pivot pins on both sides of loader. (See procedure in EVERY 50 HOURS in this section.)

OUO6077,00019AA -19-18MAR05-1/1