It is suggested the following items be checked after the loader has been operated for approximately 50 hours.
[ ] Go over entire machine for loose or missing hardware.
Mounting frame hardware is tightened to correct torque.
[ ] Check for broken or damaged parts. Repair as necessary.
[ ] Decals intact and legible.
[ ] Acquaint the customer with any special attachments that will help do a better job.
[ ] Check with the customer as to the performance of the machine.
|
[ ] Operate the loader to see if it is functioning properly.
[ ] Hydraulic hoses routed correctly and connections do not leak.
[ ] Tractor transmission/hydraulic oil level is correct.
[ ] Review the entire Operator's Manual with the customer and stress the importance of proper and regular lubrication and safety precautions.
(Date Checked)______________________________
(Signature)__________________________________
|