After-Sale

It is suggested the following items be checked after the loader has been operated for approximately 50 hours.

[ ] Go over entire machine for loose or missing hardware. Mounting frame hardware is tightened to correct torque.

[ ] Check for broken or damaged parts. Repair as necessary.

[ ] Decals intact and legible.

[ ] Acquaint the customer with any special attachments that will help do a better job.

[ ] Check with the customer as to the performance of the machine.

[ ] Operate the loader to see if it is functioning properly.

[ ] Hydraulic hoses routed correctly and connections do not leak.

[ ] Tractor transmission/hydraulic oil level is correct.

[ ] Review the entire Operator's Manual with the customer and stress the importance of proper and regular lubrication and safety precautions.

(Date Checked)______________________________

(Signature)__________________________________

OUMX005,0001D98 -19-06MAR06-1/1