When backfilling from a large pile, shovel off the top of
the pile, pushing toward the excavation. Drag some soil back to form
a work ramp of convenient grade.
-
Approach the pile with a level bucket. Actuate the lift and
bucket controls to determine the amount of material to be pushed.
|
|