Recommended Set Up/Assembly Sequence
-
Prepare the tractor.
-
Refer to Preparing the Tractor section.
-
Install mounting frames.
-
Install toolbox support bracket and toolbox.
-
Install hood guard.
-
Install mid-mount couplers and hoses.
-
Install hydraulic valves and controls as needed.
-
Prepare the loader.
-
Remove shipping banding, wire and dunnage.
-
Lower loader to the ground.
-
Install third-function oil lines and hoses, if ordered.
-
Install loader-to-mid-mount couplers hydraulic hoses.
-
Position loader on mounting frames.
-
Install bucket/attachment carrier.
-
Install bucket/attachment.
-
Perform final inspection and adjustments.
-
Install optional equipment/attachments.
|
OUMX005,0001E27-19-20060922
|
|