Recommended Set Up/Assembly Sequence
-
Prepare the tractor.
-
Refer to Prepare the Tractor section.
-
Locate and prepare loader mating surface.
-
Prepare the loader.
-
Remove all crates, parts, and bucket from around loader assembly.
-
Attach lifting straps to loader assembly and overhead hoist.
Lower loader assembly to ground (horizontal).
-
Remove and discard shipping banding, wire, and wood pallet.
-
Cut paint mask rings off all cylinders.
-
Install hood guard on tractor.
-
Install mounting frames, braces, hydraulic control valve, hoses
and parts on tractor.
-
Install loader on tractor.
-
Install bucket.
-
Install optional parking stands (if equipped).
-
Perform final inspection and adjustments.
|
|
OUO6038,00021AE-19-20130314
|
|