Recommended Setup and Assembly Sequence
-
Prepare the tractor.
-
Refer to Prepare Tractor
section.
-
Install the hood guard.
-
Locate and prepare the
loader mating surface.
-
Prepare the loader.
-
Remove all crates, parts,
and bucket or attachment from around the loader assembly.
-
Attach lifting straps
to the loader assembly and an overhead hoist. Lower the loader assembly
to the ground (horizontal).
-
Remove and discard the
shipping banding, wire, and wood pallet.
-
Cut paint mask rings
off all cylinders.
-
Remove mounting frames.
-
Install the bucket timing
rod.
-
Install mounting frames
on the tractor.
-
Install the loader on
the tractor.
-
Install the hydraulic
control valve and hoses.
-
Install the bucket or
attachment.
-
Replace all safety decals
with text-free safety decals.
-
Perform a final inspection
and adjustments.
-
Install any optional
equipment and attachments.
|
|
OUO6064,0000FBB-19-20180828
|
|