Recommended Setup and Assembly Sequence

  1. Prepare the tractor.

    1. Refer to Prepare Tractor section.

    2. Install the hood guard.

    3. Locate and prepare the loader mating surface.

  2. Prepare the loader.

    1. Remove all crates, parts, and bucket or attachment from around the loader assembly.

    2. Attach lifting straps to the loader assembly and an overhead hoist. Lower the loader assembly to the ground (horizontal).

    3. Remove and discard the shipping banding, wire, and wood pallet.

    4. Cut paint mask rings off all cylinders.

    5. Remove mounting frames.

    6. Install the bucket timing rod.

  3. Install mounting frames on the tractor.

  4. Install the loader on the tractor.

  5. Install the hydraulic control valve and hoses.

  6. Install the bucket or attachment.

  7. Replace all safety decals with text-free safety decals.

  8. Perform a final inspection and adjustments.

  9. Install any optional equipment and attachments.

OUO6064,0000FBB-19-20180828