-
Hardware torque MUST be checked after the first 10
hours and every 50 hours thereafter.
Check the mounting frame hardware. (See First 10 Hours
in Lubrication and Maintenance section.)
-
Lubricate all grease
fittings. (See Lubrication and Maintenance section.)
-
Check the loader operation.
(Refer to Controls section.)
-
Cycle all cylinders three
or four times.
-
Retract bucket cylinders
completely and lower the loader to the ground.
-
Shut off engine and remove
ignition key.
-
Check the tractor transmission/hydraulic
oil level. (Refer to the tractor Operator's Manual.)