First 10 Hours
□
Lubricate fittings on each side of loader. (See procedure in
EVERY 10 HOURS in this section.)
□
Tighten mounting frame hardware on both sides. (See procedure
in EVERY 50 HOURS in this section.)
□
Tighten nuts on pivot pins on both sides of loader. (See procedure
in EVERY 50 HOURS in this section.)
|
|
OUO6077,00019AA-19-20101006
|
|