First 10 HOURS

□  Lubricate fittings on each side of loader. (See procedure in EVERY 10 HOURS in this section.)

□  Tighten pivot pin nuts on both sides of loader. (See procedure in EVERY 50 HOURS in this section.)

□  Tighten mounting frame hardware on both sides. (See procedure in EVERY 250 HOURS in this section.)

OUO6064,0001510-19-20160509