Operating the Boom

ZX1037003

causym CAUTION: Always consult the load chart and load monitor before and during boom operation.

The boom and attachment carrier are controlled by the multi-function lever and switches.

Refer to illustration above for the multi-function lever and switch operation.


A-Carrier lock pin actuation
I-First hydraulic function connectors
II-Second hydraulic function connectors
III-Third hydraulic function connectors

ZX1037312

OUCC020,000206A -19-07APR05-1/3


ZX1037003

NOTE: A sticker summarizing all multi-function lever functions is glued on right-hand side window.

  • To operate the carrier locking pin (A), place shut-off valve lever in open position (B).

    IMPORTANT: Before operating the first (I), second (II) or third (III) hydraulic functions, place shut-off valve lever in closed position (C) to prevent accidental use of pin-locking system.

  • To operate the first (I) hydraulic function, connect hydraulic hoses to connectors (I).
  • To operate the second (II) and third (III) hydraulic functions, connect hydraulic hoses to connectors (II) and (III).


A-Carrier lock pin actuation
B-Shut-off valve lever open position
C-Shut-off valve lever closed position
I-First hydraulic function connectors
II-Second hydraulic function connectors
III-Third hydraulic function connectors

ZX1037004
ZX1033879

OUCC020,000206A -19-07APR05-2/3


NOTE: Refer to "Operating Attachments" Section for front equipment attaching/detaching procedures.

OUCC020,000206A -19-07APR05-3/3