Attaching/Detaching Equipment (John Deere Mechanical Carrier)

Proceed as follows to attach attachment on John Deere mechanical carrier:

1. Ensure locking pins (A) are fully retracted. If necessary, place lever (B) in open position to retract locking pins (A).

2. Extend the boom approximately 1 m (3 ft.), tilt the carrier slightly forward and drive up to the attachment (I).

3. Drive the machine forward, until the pick-up cones pass under the rings on the attachment (II) then lift the boom until the attachment is clear of the ground.

4. Tilt the carrier backwards (III) and engage the locking pins. Place lever (B) in closed position.

causym CAUTION: Always check locking pins to make sure they are fully engaged before tilting or operating any attachment.

5. Raise and tilt back the attachment to the travelling position. The machine is now ready for work.

To detach attachment from carrier, proceed in reverse order.


A-Locking pin
B-Lever

ZX1037339
ZX021529
ZX1034237

OUCC020,00020BD -19-20APR05-1/1