Setup Calibration Addresses
Make sure to correctly set the following calibration addresses:
-
Choose header type. See "Address SPF 100 Calibration-Header Calibration" in section Calibration Procedures.
-
Set upper and lower header limits. See "Address SPF 100 Calibration-Header Calibration" in section Calibration Procedures.
-
Set header raise rate. See "Address SPF 102 Calibration-Header Raise Rate" in section Calibration Procedures.
-
Set header lower rate. See "Address SPF 103 Calibration-Header Lower Rate" in section Calibration Procedures.
-
Set correct number of cutterhead knives. See "Address SPF 105 Calibration-Number of Cutterhead Knives" in section Calibration Procedures.
-
If necessary, check presence of 4500 harvesting unit. See "Address SPF 119 Calibration-Override 676 Header Check" in section Calibration Procedures.
-
Set correct header working width for area counter calculations. Use addresses RCP 180 to RCP 183 to proceed. See section Calibration Procedures.
Additional Lighting for 6-meter (20 ft) and 7.5-meter (25 ft) Row-Independent Harvesting Unit
Use additional headlights (low-beam). See section Lighting System and Signals.
|
Spout Extension for 6-meter (20 ft) and 7.5-meter (25 ft) Row-Independent Harvesting Unit
See section Harvesting Units and Attachments.
Use additional brake light. See section Lighting System and Signals.
Ballast
IMPORTANT:
Always proceed to a new forage harvester ballasting after changing header.
See section Wheels and Ballast.
Automatic Lubrication System
If a header with Automatic Lubrication system is removed and a header without Automatic Lubrication system is installed instead, a return line must be connected to the inlet line (on the header side); for further information see "Lubrication, Periodic Service" Section.
|