Adjust the tension of chain (A) with the idler sprocket. Spring (B) should have a length (X) of 70 mm (2.75 in.).
Adjust with hex nut (C).
A-Drive Chain B-Spring C-Adjusting Nut X-70 mm (2.75 in.)
ZX,OMSLC007632 -19-07JAN97-1/1