|
IMPORTANT:
Pump two shots of grease into each fitting. Do not over grease.
1.
Final Drive Outer Bearings (Both Sides). When operating in mud and water, grease at 10 hours. In normal conditions, grease at 400 hours.
2.
Clean out end of air conditioner drain hose (A). Be certain valve (B) is installed on end of hose.
3.
Rear Wheel Hubs (Both Sides). When working in water and mud, grease at 10 hours. In normal conditions, grease at 400 hours.
|
4.
At the end of each day, dump stone trap and run concave up and down to prevent crop buildup in concave area.
5.
Hillmaster Pivoting Front Plate Pivot - Two shots of grease.
|