Installing Cutterhead With Harvesting Unit

Make sure that lift cylinder arms are vertical. Clearances between bottom and bearing shell center on forage harvester and between bottom and bearing on cutterhead must be approximately the same.

Use bearing shell bolts to secure upper bearing shells.

IMPORTANT: Insert bolts only so far that they are flush with inner surface.

For further cutterhead installation, rerverse removal procedure.

OUZXMAY,00005A3 -19-22SEP02-1/1