Completing Conversion

Install drive belts (A).

Connect connector (B) (only with electrical adjustment of kernel processor rolls).

Connect inlet line (C) leading to distributor of central lubrication system (depending on equipment).


A-Kernel Processor Drive Belts
B-Connector (Kernel Processor Electrical System)
C-Quick Coupler (Kernel Processor Central Lubrication)

ZX1030961
ZX1030960

OUZXMAY,00005AC -19-25SEP02-1/1